Crane technician servicing an ABUS 10 t wire rope hoist during scheduled crane maintenance
Crane technician servicing an ABUS 10 t wire rope hoist during scheduled crane maintenance
/ AS 2550 Standards

Crane Maintenance & Breakdown Repairs Perth

Scheduled maintenance, rapid breakdown response and crane modernisations across Perth and WA, keeping your fleet compliant and productive between statutory inspections. We service all major hoist brands, including Stahl, Kito and Konecranes.

Statutory Audits

Statutory Compliance Standards

Our inspectors assess structural integrity and mechanical reliability against the AS 2550 series.

Standards Covered

Annual Inspections

AS 2550 Framework

Mechanical, structural and electrical inspection, with load testing where required, to keep your crane safe and compliant.

We audit gantry, overhead and jib crane systems under Western Australia safety regulations.

Major Inspections

A design working period assessment, then physical inspection of critical components, with dismantling, NDT and overhaul where needed.

We use Australian standards

Technician carrying out ultrasonic testing on an overhead crane girder weld
Technician carrying out ultrasonic testing on an overhead crane girder weld
Rigorous Auditing

The Inspection Process

We review crane logs, operational history, and previous maintenance records to identify high-risk components.

/ Step 02

Structural & NDT Testing

Non-destructive testing of nominated critical welds and components, where the inspection plan calls for it.

/ Step 03

Written Report

A written report with findings and required actions for your site records.

Found, ground out, re-welded

A shock-loaded end carriage we repaired: the crack found at NDT, ground back to sound metal, then re-welded.

Crack at a crane end carriage weld toe, found with NDT after a shock load
Crack at a crane end carriage weld toe, found with NDT after a shock load
1. Crack found at NDT
Cracked weld ground out to sound metal ready for re-welding
Cracked weld ground out to sound metal ready for re-welding
2. Ground out to sound metal
Completed re-weld on the crane end carriage after the shock load repair
Completed re-weld on the crane end carriage after the shock load repair
3. Re-welded and checked

Secure Site Compliance

Ensure your heavy lifting machinery meets strict AS 2550 standards. Book a service or inspection with our Perth team today.